National College for Nuclear

National College for Nuclear Client Seddon Construction / The Lakes College Value £15,000,000 Located on land next to The Lakes College in Lillyhall, this National College for Nuclear is one of two new hubs (the other is to be located in Somerset) being made possible thanks to a partnership between government and nuclear employees such …

Read moreNational College for Nuclear

Ysgol Glan Clwyd

Ysgol Glan Clwyd Client Willmott Dixon Value £16,000,000 Ysgol Glan Clwyd in St. Asaph is receiving a £16m redevelopment that will allow the school to increase its capacity from 1000 to 1250 pupils. Plans for the school include the development of a new, three-storey, modern building adjacent to fully refurbished existing building. The existing design …

Read moreYsgol Glan Clwyd

Manchester Enterprise Academy

Manchester Enterprise Academy Client Willmott Dixon Value £6,000,000 Manchester Enterprise Academy recently received a brand new three-storey development, which sits adjacent to the school’s existing building, providing 3800m2 of new teaching facilities to accommodate the academy’s growing number of pupils. The new building, known as the Durie Building, consists of nine English classrooms, with an …

Read moreManchester Enterprise Academy

Studio @ Deyes

Studio @ Deyes Client Willmott Dixon Value Undisclosed TACE worked with Willmott Dixon to refurbish an existing office building in Liverpool to create a brand new studio school. Studio @ Deyes is a school for 14 -19 year olds specialising in engineering, fashion and business. Studio schools teach the National Curriculum but with the added …

Read moreStudio @ Deyes

Goldthorpe Primary School

Goldthorpe Primary School Client Robertson Value £4,000,000 A new build, single-storey block replaced the existing Goldthorpe Primary School and now acts as a striking gateway to the area.   The school provides space for 310 pupils and 26 full time nursery spaces. The design of the school has allowed for future expansion to a 420 …

Read moreGoldthorpe Primary School

UTC Warrington

UTC Warrington Client JMC Group Value £10,000,000 The new UTC will be run by Manchester Metropolitan University and specialises in energy and engineering. UTCs are Government-funded colleges that provide 14-19 year olds with an alternative education based on vocational training. The six-storey UTC building was constructed next to the new ‘Business Incubator’ facility and was …

Read moreUTC Warrington

St. Thomas’ CE Primary School

St Thomas CE Primary School Client Seddon Construction Value £5,000,000 Procured via the North West Construction Hub St. Thomas’ CE Primary School recently received a £5 million new build extension to provide provisions for 360 pupils.  The existing school was extended to include a new junior block for pupils aged 7 – 11 as well …

Read moreSt. Thomas’ CE Primary School

Southlands School

Southlands School Client Conlon Construction Value £2,500,000 Southlands School recently underwent refurbishment and remodelling works to several internal areas, plus the construction of a new build sports hall and associated ancillary spaces. The refurbishment works created new Maths and English classrooms along with a state-of-the-art ICT suite. The existing changing rooms were remodelled into several …

Read moreSouthlands School

Rhyl High School

Rhyl High School Client Willmott Dixon Value £25,000,000 TACE advised Willmott Dixon throughout the construction of the new Rhyl High School. The project replaced existing buildings at the school with a brand new, three-storey building capable of accommodating 1,245 pupils as well as an additional 45 pupils from a nearby SEN school. The new school …

Read moreRhyl High School

Bowdon Church School

Bowdon Church School Client Willmott Dixon Value £4,000,000 Bowdon Church School is a new build scheme that provides much needed extra space to an oversubscribed primary school. The expansion of the school saw it move from a 2 Form Entry school to a 3 Form entry (an increase of 210 pupils) meaning it is now …

Read moreBowdon Church School

Church Lawton School

Church Lawton School Client Cheshire East Council / ISG Value £4,000,000 This project saw an existing, derelict school building extended and refurbished in order to house a new primary school for 60 autistic pupils aged between 4 – 19 years old. The facility caters for children and young people with high-functioning autism who need support …

Read moreChurch Lawton School

Essa Primary School

Essa Primary School Client ISG Value £2,000,000 Essa Primary School is a brand new primary school that will join forces with Essa Academy to become Bolton’s second ‘super school’. The new school was developed in response to the increase in demand for primary school places within the local area. A former high school building has …

Read moreEssa Primary School

Ladybarn Primary School

Ladybarn Primary School Client Willmott Dixon Value £2,000,000 Ladybarn Primary School recently underwent an extension and refurbishment in order to improve its provisions for its students. The works created four new classrooms, a performance hall, community spaces, an extended staff room and a new play area. TACE delivered the design of the complete mechanical and …

Read moreLadybarn Primary School

Oldham College – Building C

Oldham College – Building C Client Willmott Dixon Value £6,000,000 This scheme included the construction of a brand new, three-storey block built on the previous Walton Tower site at Oldham College. The new block caters specifically to hair and beauty courses and houses its own commercial salon for the students to work in. Alongside this …

Read moreOldham College – Building C

Darwen Aldridge Enterprise Studio

Darwen Aldridge Enterprise Studio Client ISG Value £4,100,000 Darwen Aldridge Enterprise Studio officially opened in September 2013. The school was temporarily based at Darwen Aldridge Community Academy whilst refurbishment and extensions works were carried out at a former model lodging house that would eventually become the it’s permanent residence. The former model lodging house underwent …

Read moreDarwen Aldridge Enterprise Studio

MMU – Sir Kenneth Green Library

Sir Kenneth Green Library, MMU Client Gardiner & Theobald Value £2,800,000 TACE were appointed via Gardiner & Theobald on this £2.8m, multi-level refurbishment for Manchester Metropolitan University. The scheme was part of the university’s project to consolidate several of its libraries previously spread across several campuses, to just one site. To accommodate these relocations Sir …

Read moreMMU – Sir Kenneth Green Library

The Maltings College

The Maltings College Client The Maltings College Value 2,000,000 The refit and refurbishment of an existing college building plus the construction of a new annex buildings. The Maltings College specialises in teaching courses that prepare young people for the working environment and the annex was purpose built to provide spaces in which specialist skills could …

Read moreThe Maltings College

Cheadle Hulme High School

Cheadle Hulme High School Client Kier Value £4,500,000 Delivered via the North West Construction Hub Cheadle Hulme High School recently received a new sixth form centre and an extension to the existing music and arts facility. As well as providing several new classrooms, the sixth form centre also accommodates a library, study spaces and a …

Read moreCheadle Hulme High School

Bournville College

Bournville College Client AA Projects Value £66,000,000 The relocation of the existing college to Longbridge in order to consolidate the colleges four buildings into one new campus. The development comprised of a five-storey teaching block which provides the college’s main teaching and learning space with a construction centre, motor vehicle centre, a six-court sports hall …

Read moreBournville College

King’s Road Primary School

King’s Road Primary School Client Willmott Dixon Value £3,700,000 King’s Road Primary School recently received a brand new 1600m2 two storey teaching block, as well as undergoing refurbishment and remodeling to various areas throughout the existing building.   The new build utilised an ASHP system, above ground drainage systems and comfort cooling in the ICT …

Read moreKing’s Road Primary School

Oswald Road Primary School

Oswald Road Primary School Client Willmott Dixon Value £3,000,000 Oswald Road Primary School was extended and redeveloped to allow the school to increase its intake. The new building includes 11 new classrooms, multi-use hall, catering facilities and office accommodation. The existing building has been refurbished throughout providing new lighting, power and data, water services and …

Read moreOswald Road Primary School

Leighton Primary School

Leighton Primary School Client Cheshire East Council Value £500,000 Extension works at Leighton Primary School created two new single storey classrooms to replace two existing dilapidated mobile classrooms on site.   One of the mobile classrooms was being used as a Year 1 and SEN teaching space whilst the other had been decommissioned from teaching …

Read moreLeighton Primary School

Wilmslow High School

Wilmslow High School Client Jones Contracts Value £1,650,000 An extension to an existing sixth form block provided replacement teaching accommodation for students with additional learning needs. The new building comprised of several areas that catered specifically to the needs of different students; an inclusion unit, physiotherapy room, dyslexia room and a hearing impaired unit. The …

Read moreWilmslow High School

Tytherington High School

Tytherington High School Client Cheshire East Council Value £3,130,000 Tytherington High School underwent a £3.13m renovation to replace 8 dilapidated mobile classrooms with a new, two storey, 10 classroom block that now provides coherent teaching environments. The new block also houses 4 new ICT suites and an internet café inspired breakout area. Significant refurbishment of …

Read moreTytherington High School

Saughall Primary School

Saughall Primary School Client Cheshire East Council Value £4,300,000 Saughall Primary School was constructed to accommodate the newly amalgamated schools of Ridings & Thomas Wedge. The new facility provides classrooms for Reception through to KS3, a multi-use sports hall, a kitchen, an amphitheatre, hard and soft play areas, as well as separate play areas for …

Read moreSaughall Primary School

Poynton High School

Poynton High School Client Cheshire East Council Value £4,000,000 This scheme replaced over-capacity Portakabin facilities at the school and created in its place a modern, learning environment supported by open-plan, naturally ventilated social spaces. The ultramodern sixth form centre comprises of 10 seminar rooms, 2 ICT rooms, an internet café, a breakout/work space, as well …

Read morePoynton High School

Old Moat Primary School

Old Moat Primary School Client Manchester City Council Value £7,000,000 Old Moat was a new two storey primary school. The new facility has a children centre integrated within the project and the site incorporates a new multi utility games area.   The design for the project included ASHP and solar technologies that contributed to the …

Read moreOld Moat Primary School

Birkenhead High School Academy

Birkenhead High School Academy Client Wirral Borough Council Value £9,500,000 As part of their move to academy status, Birkenhead High School refurbished their existing buildings, whilst also adding new accommodation. Sensitive refurbishment was required in order to keep in historical character of the school whilst allowing its students to benefit from state-of-the-are facilities. The project …

Read moreBirkenhead High School Academy

Kinsale Autistic Centre

Kinsale Autistic Centre Client AFL Value Undisclosed Flintshire County Council developed an ex-steelworks site into a new care and reablement service facility for children and young adults (ages 8-19) with autistic spectrum conditions (ASD). The facility has two residential blocks that have been designed and developed specifically to meet the needs of the occupants. The …

Read moreKinsale Autistic Centre