Willmott Dixon / Forestry England
£9,000,000
Sustainability was at the heart of this project and our design followed suit with photovoltaics on the roof, a ground source heat pump and sustainable drainage system in the car park and rainwater harvesting all being implemented. The latest LED lighting and low energy products were also utilised helping minimise the impact on the environment.
Timber was used throughout the building providing a key design feature both internally and externally, whilst also demonstrating Forestry England’s commitment to sustainable design.
info@tace.co.uk
Manchester:
Portland House, Earl Road, Cheadle Hulme, SK8 6QL
London:
75 Cowcross Street, London, EC1M 6EL
Liverpool:
The Plaza, 100 Old Hall Street, L3 9QJ